Home

Articles from E3 LITHIUM LTD.

E3 Lithium Begins Site Construction for Phase 2 of the Clearwater Demonstration Facility
E3 LITHIUM LTD. (TSXV: ETL) (FSE: OW3) (OTCQX: EEMMF), “E3”, “E3 Lithium” or the “Company,” a leader in Canadian lithium, has commenced construction on its Phase 2 demonstration facility site, located east of the town of Olds, Alberta in E3 Lithium’s Clearwater Project Area. Since receiving approval of its required permits from the Alberta Energy Regulator, announced on September 11, 2025, the Company has been advancing preparation activities and is actively grading the site to be ready for the planned drilling program as part of Phase 2 of the Demonstration Facility.
By E3 LITHIUM LTD. · Via Business Wire · October 21, 2025
E3 Lithium Announces Filing of NI 43-101 Technical Report for Updated Resource Estimate in the Garrington District
E3 LITHIUM LTD. (TSXV: ETL) (FSE: OW3) (OTCQX: EEMMF), “E3 Lithium” or the “Company,” a leader in Canadian lithium, is pleased to announce that it has filed a National Instrument 43-101 – Standards of Disclosure for Mineral Projects independent technical report for its Garrington District project in central Alberta.
By E3 Lithium Ltd. · Via Business Wire · July 22, 2025
E3 Lithium Announces Arrival of Equipment for the Demonstration Facility at the Clearwater Project Site
E3 LITHIUM LTD. (TSXV: ETL) (FSE: OW3) (OTCQX: EEMMF), “E3”, “E3 Lithium” or the “Company,” a leader in Canadian lithium, is pleased to announce the on-schedule arrival of equipment for the Demonstration Facility at the Clearwater Project site, including the 30-column Direct Lithium Extraction ("DLE") system and associated polishing and purification units. This equipment will be used for both Phase 1 and Phase 2 of the planned testing at the Demonstration Facility.
By E3 Lithium Ltd. · Via Business Wire · July 10, 2025